Dyno Nobel’s Titan ∆E 1000 was trialed over a period of four (4) months at AngloGold Ashanti's Cripple Creek & Victor Gold Mining Co. (CC&V) in Cripple Creek, Colorado. Performance of the Titan ∆E 1000 product was measured against typically loaded production blasts of similar size, in similar geology. Blast designs (drill pattern and blast hole sequence) for the performance and baseline blasts were not altered during the trial, and all blasts, except for one, were initiated using Dyno Nobel’s DigiShot® Plus electronic initiation system. Measured results confirmed that significant value in productivity, cost and blast performance were delivered. The mine reduced its overall powder factor by 18%, realized an 8% increase in shovel productivity in both waste and ore, and in the case of ore, experienced no reduction in crusher throughput. Additionally, they completely eliminated visible NOx after blast fumes in even the wettest areas of the pit.
Project goal is to remove a small section of bench and creating a final wall catch bench without disturbing neighboring homes within 750 feet of ...View more
An application to determine how various blast patterns proposed for a project would perform in the field.View more
A fragmentation model developed in-house by Dyno Nobel was employed to model the fragmentation that would result from changes in the various blas ...View more
The use of SHA (Signature Hole Analysis) and electronic detonators allowed the mine to dial in optimum timing sequences regardless of the number ...View more