Oversized hang-ups present significant challenges to ore flow for mine operators. MacLean’s comprehensive suite of ore flow solutions starts with Water Cannons as a first line of attack to bring down hang-ups; it progresses to low, medium, and highreach Blockholer drills for persistent hang-ups and secondary breaking; then moves to the Mobile Rockbreaker for fragmenting the oversize at source without blasting. www.macleanengineering.com
Blog post on pipe handling safety in the underground hard rock mining environment. View more
High pressure water as an ore flow solution: A mining innovation partnership between MacLean Engineering and Newcrest's Telfer mine in Western ...View more
Prohibitive ventilation costs as mines go deeper and concerns about worker health and safety are ushering in a new era in propulsion options for ...View more
Drawpoint hang-ups represent significant impediments to getting the resource out of the ground in the safest, most expedient way, while oversize ...View more